Item Coversheet
TOWN OF PALM BEACH
Town Council Meeting Development Review on: February 10, 2021

Section of Agenda
Development Review - New Business

Agenda Title
Z-20-00323 VARIANCE(S)  Zoning District: R-A Estate Residential  The application of DESRUISSEAUX LAND TRUST U/A/D 12/6/19 (ANN DESRUISSEAUX AND WILLIAM W. ATTERBURY, CO-TRUSTEES), Applicant, relative to property located at 800 S COUNTY RD, legal description on file, is described below.  Without waiving any previous zoning approvals, the applicant is requesting to demolish and rebuild (replicate) the existing landmarked residence in generally the same location. The project includes raising the finished floor elevation of all of the new and existing structures to 9.0 feet NAVD. The proposed new two story residence will be 19,812.69 square feet, with a 3,398 square foot guest house located at the northwest corner of the property. The plan also includes relocation of an existing 225 square foot cabana and relocation of the 145 square foot 2 story generator building. The following variances are being requested: 1) 134-843(8): a north side yard setback ranging from 5.29 feet to 5.75 feet for the new reconstructed guest house wing (previously referred to as the boat house) in lieu of the 30 foot minimum required; 2) 134-843(8): a rear yard setback of 0 feet in lieu of the 15 foot minimum required for the new reconstructed guest house wing; 3) 134-843(8): a rear yard setback ranging of 0 feet in lieu of the 15 foot minimum required for the new reconstructed main house; 4) 134-843(8): a north side yard setback of 21.13 to 21.67 feet for the 2 story generator building in lieu of the 30 foot minimum required; 5) 134-843(10): a height in the main residence and guest house to be 26.56 in lieu of the 25 foot maximum allowed; 6) Section 134-843(8): a south side yard setback for the main house addition ranging from 10.79 feet to 15.1 feet in lieu of the 30 foot minimum required. The previously granted variances in Z-20-00261 for the accessory buildings and structures not associated with the main house, guest house wing and generator building remain unchanged and in effect and valid.  [Applicant's Representative: Maura Ziska Esq]  [The Landmarks Preservation Commission deferred the project to the February 17, 2021 meeting.  Carried 7-0.]  Request for Withdrawal Per Letter from Maura Ziska
 


Presenter


ATTACHMENTS:
Description
Letter Dated February 1, 2021 from Maura Ziska